I-70 St.
Charles County Phase II
Lane Addition and Resurfacing
MODOT
Access Engineering, LLC subcontracted the preliminary design of this project which will extend the lane addition another mile to the west and resurface the Outer Roads. This project also includes the design of an enclosed drainage system. Plans were generated in Microstation/GEOPAK.
I-70 St. Charles County Phase
I
Lane Addition and Resurfacing
MODOT
Access
Engineering, LLC subcontracted the design of this 4+ mile project. This was a
two part project consisting of 4.5 miles of resurfacing and signing and a CMAQ
funded lane addition with noise study. The project included the design of an
enclosed drainage system with over 5000 ft. of pipe and 50 structures that tied
into numerous existing drainage systems. Access also subcontracted the
Preliminary Plan signing layout on this 4+ mile project. Plans were generated
in Microstation/GEOPAK.
ROADWAY DESIGN EXPERIENCE
Highway 67 and Orchard Lane - Roundabout Design - MoDOT
Old Business 61 - Roundabout and Traffic Signal Design - City of Wentzville, MO
I-70 St. Charles County Phase I - Lane Addition and Resurfacing - MoDOT
I-70 St. Charles County Phase II - Lane Addition and Resurfacing - MoDOT
Hwy 112 Barry County, Missouri - Intersection Realignment and Sight Distance Improvements - MoDOT
Hwy. KK Franklin County, Missouri - Roadway Realignment for Bridge Replacement - MoDOT
Independence Road Extension - Roadway Design - Weldon Spring, Missouri
Hwy. KK Franklin County, Missouri
Roadway Realignment for Bridge Replacement
MoDOT
Access Engineering, LLC subcontracted the Concept Plan design for the roadway realignment of this rural bridge replacement.
Hwy. 112 Barry County, Missouri
Intersection Realignment and Sight Distance
Improvement
MoDOT
Access Engineering, LLC subcontracted the Preliminary Plan design of this Enhancement Project which improves the existing intersection of Hwy. 112 and Rte. F and changes the vertical alignment of Hwy. 112 in the vicinity of the intersection to improve sight distance. Plans were generated in Microstation/GEOPAK.



Independence
Road Extension
Roadway Design
Weldon Spring, Missouri
Marie C. Dennis, P.E. designed the Preliminary Plans for this new 1 mile extension of Independence Road in Weldon Spring, Missouri. She also developed the Topographic Study and all right-of-way acquisition documents. Plans were generated on Autocad/Softdesk.
Old Halls Ferry Road
Roadway Reconstruction
Saint Louis County Department of Highways and Traffic
Access Engineering, LLC subcontracted the Topographic Study and Preliminary Plan design for this 1 mile roadway reconstruction. Plans were generated in Microstation/GEOPAK.
Old Business 61
Roundabout and Traffic Signal Design
City of Wentzville, MO
Access Engineering, LLC is subcontracting the design of a roundabout and traffic signal for this one mile road reconstruction project funded by the T.I.P.. Access is also responsible for access management analysis and traffic control plans for the project.
Access Engineering, LLC is currently under contract with MoDOT District 10 in the design of two roundabouts at the proposed interchange of Highway 67 and Orchard Lane. The project is being executed by MOU under the on-call Consultant program. Access in in the Preliminary Design Phase of the roundabout.