Transportation Engineering

Civil Engineering

Construction Management

 Traffic Engineering

Access Engineering
Access Engineering

 

 

ROADWAY DESIGN EXPERIENCE

Ventura Village Apartments Access Road 

Highway 67 and Orchard Lane - Roundabout Design - MoDOT

Old Business 61 - Roundabout and Traffic Signal Design - City of Wentzville, MO

I-70 St. Charles County Phase I - Lane Addition and Resurfacing - MoDOT

I-70 St. Charles County Phase II - Lane Addition and Resurfacing - MoDOT

Hwy 112 Barry County, Missouri - Intersection Realignment and Sight Distance Improvements - MoDOT

Hwy. KK Franklin County, Missouri - Roadway Realignment for Bridge Replacement - MoDOT 

Old Halls Ferry Road - Roadway Reconstruction - Saint Louis County Department of  Highways and Traffic

 

 

Ventura Village Apartment Access Road
Department of Housing and Development

Access Engineering, LLC is currently under contract with the Department of Housing and Development of St. Louis to design a new entrance from Lucas & Hunt Road to the Ventura Village Apartment complex.  The project includes the access road to the existing apartments, and the widening of Lucas & Hunt Road to provide a designated left turn lane.

 Highway 67 at Orchard Lane
Roundabout Design
MoDOT

Access Engineering, LLC is currently under contract with MoDOT District 10 in the design of two roundabouts at the proposed interchange of Highway 67 and Orchard Lane.  The project is being executed by MOU under the on-call Consultant program. 

 Old Business 61
Roundabout and Traffic Signal Design
City of Wentzville, MO

Access Engineering, LLC is a subconsultant responsible for the design of a roundabout and traffic signal for this one mile road reconstruction project funded by the T.I.P..  Access is also responsible for access management analysis and traffic control plans for the project.

I-70 St. Charles County Phase I 
Lane Addition and Resurfacing
MODOT 


Access Engineering, LLC subcontracted the design of this 4+ mile project.  This was a two part project consisting of 4.5 miles of resurfacing and signing and a CMAQ funded lane addition with noise study.  The project included the design of an enclosed drainage system with over 5000 ft. of pipe and 50 structures that tied into numerous existing drainage systems. Access also subcontracted the Preliminary Plan signing layout on this 4+ mile project.  Plans were generated in Microstation/GEOPAK. 

I-70 St. Charles County Phase II
Lane Addition and Resurfacing
MODOT

Access Engineering, LLC subcontracted the preliminary design of this project which will extend the lane addition another mile to the west and resurface the Outer Roads.  This project also includes the design of an enclosed drainage system. Plans were generated in Microstation/GEOPAK.

Hwy. 112 Barry County, Missouri
Intersection Realignment and Sight Distance Improvement
MoDOT 

Access Engineering, LLC subcontracted the Preliminary Plan design of this Enhancement Project which improves the existing intersection of Hwy. 112 and Rte. F and changes the vertical alignment of Hwy. 112 in the vicinity of the intersection to improve sight distance.  Plans were generated in Microstation/GEOPAK.

Hwy. KK Franklin County, Missouri
Roadway Realignment for Bridge Replacement
MoDOT 

Access Engineering, LLC subcontracted the Concept Plan design for the roadway realignment of this rural bridge replacement.

Old Halls Ferry Road
Roadway Reconstruction

Saint Louis County Department of  Highways and Traffic

Access Engineering, LLC subcontracted the Topographic Study and Preliminary Plan design for this 1 mile roadway reconstruction.  Plans were generated in Microstation/GEOPAK.